Cozy Blue Residence
There is very little left and the first house is ready
Learn More1/9/2020Only two months building the house had already acquired traits.
Learn More5/2/2020Second floor, preparation of structures for the roof and walls of the first floor.
Learn More20/1/2020Construction of the ground floor frame and the arrangement of floors 2 floors.
Learn More24/12/2019We have been preparing for a long time and finally we begin the construction of our project.
Learn More29/11/2019